Selected notable and challenging projects involving the directors of KNT Consult.
Project Highlights
Notable and challenging projects
Some of the notable and challenging projects that the directors were involved in are listed below.
Designing Works
- Projek Penswastaan Lebuhraya Bertingkat Sungai Besi - Ulu Kelang (SUKE)Piled foundation design for alternative bridge viaduct design.
- Jalan Duta - Ulu Kelang Expressway (DUKE, Phase 3)2D finite element analysis for 9.7m contiguous bored pile with permanent soil nail strutting.
- Jalan Lingkaran Tengah Seremban, Fasa 3BGeotechnical input including bridge foundations, ground treatment for road alignment, and construction support.
- Expressionz Condominium, Jalan Tun RazakBored pile foundation design in karstic limestone formation.
- Proposed Development of Bukit Lagong, Mukim Rawang, Daerah GombakGeotechnical design for building foundation, infrastructure ground treatment, and slope stability with soil nail reinforcement for a 1000 acre development.
- Unio Residences, Jalan KepongPiled foundation design over limestone formation.
- Scarletz Suites @ KL City, Lorong Yap Kwan SengPiled foundation design over limestone formation.
- D'Island Residence, PuchongReclamation of ex-mining lake with underwater slope stability check.
- Skylake Condominium, Jalan Putra Perdana 5CAlternative building foundation proposal.
- West Coast Expressway Section 9, Kg Lekir to Changkat Cermin InterchangeAlternative bridge approaches design and simulation of construction stages by finite element program.
- Pan Borneo Highway, Package W02 and W32Geotechnical input including bridge foundations, ground treatment for road alignment, and construction support.
- Millerz Square, Old Klang RoadPiled foundation design over sandstone formation.
- Avara Seputeh, Old Klang RoadPiled foundation design over sandstone formation.
- Eco Business Park (Eco Grandeur), Ecoworld, Puncak AlamGeotechnical consultant for earthwork and ground treatment for a 400 acre industrial development.
- Jalan Lingkaran Tengah Seremban, Fasa 3BGeotechnical design including bridge foundations, ground treatment, construction support, and monitoring.
- Vinda New Factory, Bukit RajaFoundation design for a 30 acre factory over soft Malaysian marine clay.
- Bandar Bukit Raja Stage 3 Development1000 acres of development land for residential and industrial use.
- High Value Manufacturing Park, UMW Serendah315 acres of development land for industrial use at Section 20, Mukim Serendah.
- New Logistic Hub, Persiaran Jubli Perak, Section 22, Shah AlamTwo warehouse blocks with column loading of 35,000kN.
- EPCC of PGU-1 Gas Pipeline Replacement (GRAPHITE), Kertih, TerengganuReplacement of old 33km gas pipeline from Kertih to Kijal.
Independent Checking Engineer (ICE)
- ICE to PLUS Malaysia BerhadSime Darby Ainsdale Development, proposed bridge over North South Expressway (PLUS). Geotechnical independent checking engineer for bridge foundation system checking.
- ICE to Projek Lintasan Kota Holdings Sdn. Bhd. (PROLINTAS)Ampang-Kuala Lumpur Elevated Highway (AKLEH), East Bound KM4.6 to KM6.0, Phase 2. Geotechnical independent checking engineer for bridge viaduct foundation checking.
- ICE to Prasarana Malaysia BerhadMixed Development on Lot 99, Section 58, Kuala Lumpur. Independent checking for deep excavation within 2nd reserve of LRT tunnels.
- ICE to Dewan Bandaraya Kuala Lumpur (DBKL)68-storey office building at Jalan Gurney, Kuala Lumpur. Independent checking engineer for basement excavation checking.
- ICE to SKVE Holdings Sdn. Bhd.South Klang Valley Expressway Section 2, rest and service area and toll plaza. Independent checking for road foundation design and settlement evaluation.
- ICE to Iskandar Investment Berhad GroupThe Coastal Highway Southern Link, Johor. Independent checking engineer for ground treatment and bridge foundation design.
- ICE to Jabatan Kerja Raya Malaysia (JKR)Upgrading Jalan Pelabuhan Utara from Klang Container Terminal to Northport, Pelabuhan Klang. Independent checking engineer for ground treatment works.
- ICE to Jabatan Kerja Raya Malaysia (JKR)Sports complex development at Mukim Bagan Datuk, Hilir Perak. Independent checking engineer for ground treatment works.
Independent Checking Engineer - DOE Subject Specialist
- ICE to Jabatan Alam SekitarProposed disposal area for sediment from JOR Lake of Sultan Yussuf Power Station at PDA3, Bukit Tapah Forest Reserve, Perak. Appointed subject specialist (Geotechnical) as independent checking engineer for EIA submission.